Bathroom remodeling in San Antonio
From a hall-bath refresh to a full primary suite, we handle demolition, waterproofing, tile, vanities and finishes in the right order, so the room looks finished and holds up to daily use.

What is included
- Walk-in showers and tub-to-shower conversions
- Shower wall waterproofing
- Floor and wall tile, niches and benches
- Vanities, tops and mirrors
- Glass shower enclosures
- Drywall, trim and paint
- Grab-bar blocking and lower-threshold entries on request
- Final punch list and closeout walkthrough
What affects the price
Every estimate is written for your space. These are the items that move the number most:
- Shower size and glass type
- Tile size, pattern and amount
- Moving the drain, toilet or vanity
- Water damage found during demolition
- Vanity and finish quality
- Accessibility features
Bathroom remodel costs in San Antonio
The biggest difference between two bathroom remodel quotes is the scope. A finish refresh covers paint, fixtures, countertops and surfaces. A same-layout full remodel adds shower or tub work, waterproofing, tile and a new vanity. A layout-changing remodel adds relocated plumbing, wall changes and more trade work.
We price your bathroom line by line after a walkthrough, so you can see what each choice adds. For a deeper look at what drives the number, read our 2026 guide to bathroom remodel costs and permits in San Antonio.
Shower remodels and tub-to-shower conversions
A shower remodel replaces the walls, pan, tile and glass of an existing shower. A tub-to-shower conversion removes the tub and builds a walk-in shower in its place. Either way, we check the floor structure first, then frame, waterproof and tile, and finish with the glass enclosure, niches and benches you choose.
Lower-threshold entries and grab-bar blocking can be added on request for easier everyday use.
Bathroom remodel permits in San Antonio
Replacing tile, a vanity or finishes in place usually does not need a permit. Moving drains or supply lines, adding circuits or changing the structure does. Inside city limits, permits go through the City of San Antonio Development Services Department; nearby cities such as Helotes, Boerne and Fair Oaks Ranch run their own permit offices. We confirm the right office for your address before we price the job.
How long a bathroom remodel takes
The schedule depends on the scope: a same-layout update moves faster than a remodel that relocates plumbing or needs inspections. Waterproofing, tile setting and grout also need time to cure before the next step. Your written estimate includes a schedule for your bathroom.
See the work
Real photos of bathrooms we have completed, in the Bathrooms section of our project gallery.
How the work runs
- WalkthroughWe check the layout and what is behind the walls where we can.
- Scope and estimateA written scope lists tile, vanities, waterproofing method and what changes the price.
- PermitsAny plumbing or electrical changes are permitted by the licensed trades before work starts.
- BuildDemolition, framing repairs, waterproofing, tile, then vanities and trim.
- CloseoutFinal walkthrough, caulk and grout check, and punch list.
Bathroom remodeling questions
Do I need a permit to remodel a bathroom in San Antonio?
Replacing tile, a vanity or finishes in place usually does not. Moving drains or supply lines, adding circuits or changing the structure does. We confirm the right permit office for your address.
Who handles the plumbing in a bathroom remodel?
Plumbing work is performed and permitted by a properly licensed plumbing contractor. Royal Clover handles demolition, framing, waterproofing, tile, vanities and finishes, and schedules around the plumber.
What if you find damage behind the walls?
Older bathrooms sometimes hide water-damaged framing or subfloor. If we find it, we stop, show you photos and price the repair in writing before continuing.
Can you convert a tub to a walk-in shower?
Yes. It is one of the most common requests. We check the floor structure first, then frame, waterproof and tile the new shower.
How much does a bathroom remodel cost in San Antonio?
It depends on the scope, not a single local average: a finish refresh, a same-layout full remodel and a layout-changing remodel are priced very differently. We send a written, line-by-line estimate after a walkthrough. Our bathroom remodel cost guide explains the main cost drivers.
How long does a shower remodel take?
It depends on the shower size, whether the drain moves, the tile you choose and the cure time for waterproofing and grout. Your written estimate includes a schedule for your shower.
Often paired with
Home remodeling
Room makeovers, open layouts and whole-home updates, planned with you and managed from demo to final walkthrough.
Home additions
Primary suites, in-law suites, bedrooms, living space and sunrooms, from drawings and permits to matching finishes.
She sheds and backyard studios
Finished backyard retreats, craft rooms and studios with windows, porches and a real interior.